Procedures under Article 76 of the Land Readjustment Act

Tweet on Twitter
Share on Facebook
Share on Line

Page ID 1009089  Updated on August 28, 2025

PrintPrint in large text

Article 76 Permit Application Standards

The following construction activities within the area of the Land Readjustment Project conducted by the association require the mayor's permission in accordance with Article 76, Paragraph 1 of the Land Readjustment Act.

  • Change of Land Characteristics (Cutting and Filling)
  • New construction, expansion, and renovation of buildings and structures (fences, retaining walls, garages, etc.)
  • Installation or accumulation of items that are not easy to move (over 5 tons)

In addition, an Opinion Statement from each association will be required for the application.

Back to the top of this page

Flow of Permission Application

Back to the top of this page

Points to Note

- The eastern part of the Minamiyama area prohibits the installation of on-site infiltration facilities. Please indicate on the layout plan that the residential land is connected to the main rainwater and sewage pipes (separate system).

Regarding the "Location Number of the Act" in the Article 76 Permission Application Form, please check with each union office when obtaining the "Temporary Land Exchange Certificate" or "Reserved Land Certificate" issued by the union.
If the notation of the "land number of the act" is not unified, it may affect the building confirmation process.

・From April 1, 2022, it is required to present identification documents of the applicant when applying and receiving. In the case of corporations, in addition to identification documents, documents that show affiliation (employee ID, business card, etc.) must also be presented.
In addition, the seal is no longer required in the applicant and agent section of the Article 76 application form.

Back to the top of this page

Number of Copies Submitted

Inquiry of opinions to each union 2 copies (1 original, 1 copy)
Application for Permission under Article 76 of the Land Readjustment Act 2 copies (1 original, 1 duplicate)

Back to the top of this page

Application Form Attachment Documents

Buildings Requiring Construction Confirmation

 

  1. Application Form
  2. Opinion Statement Issuance Request
  3. Power of Attorney (specifying the contents related to the procedures of the Land Readjustment Project, Article 76 of the Land Readjustment Act)
  4. Opinion Statement of the Implementer
  5. Copy of provisional land exchange certificate or reserved land certificate, or both
  6. Building Confirmation Application Form (From the Second Page to the Fifth Page)
  7. Guide Map
  8. Site Plan [Scale 1:500 or larger]
  9. Floor plan of each floor [Scale 1:200 or larger]
  10. Elevation drawing (two or more sides) [scale 1:200 or larger]
  11. Cross-sectional view (two or more sides) [scale 1:200 or larger]
  12. Documents showing the basis for the area of the site and buildings

 For documents from 6 to 12, the basic principle is to use the documents for building confirmation application.
For inquiries to each union, attach documents 2, 3, and 5 through 12; for permission applications under Article 76, attach documents 1 and 3 through 12.

Structures Requiring Building Confirmation

 

  1. Application Form
  2. Opinion Statement Issuance Request
  3. Power of Attorney (specifying the contents related to the procedures of the Land Readjustment Project, Article 76 of the Land Readjustment Act)
  4. Opinion Statement of the Implementer
  5. Copy of provisional land exchange certificate or reserved land certificate, or both
  6. Guide Map
  7. Floor Plan
  8. Cross-sectional view
  9. Other structural diagrams and more

Note: This document will clarify the relocation or new installation of pipe diameter, pipe material, soil cover, position, etc. The same applies to structures, retaining walls, etc.

 For inquiries to each union, attach documents 2, 3, and 5 through 9; for permission applications under Article 76, attach documents 1 and 3 through 9.

Activities that do not require permission

 

  1. Repairs and renovations that do not require building confirmation for buildings and designated structures
  2. Installation of gas, electricity, telephone, water, and sewerage service lines associated with construction work
  3. Actions agreed upon with the future road manager specified in the business plan for road structures within the road
  4. In cases where procedures equivalent to Article 76 of the Land Readjustment Act are carried out, such as entering into implementation agreements for urban planning projects other than the relevant project (limited to cases not involving building confirmation)

Among the building activities that do not require building confirmation, procedures will be omitted for those activities recognized as unlikely to obstruct the execution of the business. In addition, the relocation of structures carried out at the request of the executor of the business is not subject to this procedure.
Please note that for actions other than those mentioned above, judgment will be made based on their content, so please consult with the implementer (each union) in advance in such cases.

Back to the top of this page

Land Readjustment Association Contact Information

Minamiyama Eastern Land Readjustment Project Association

Address: 1462-1 Momura, Inagi City
Phone 042-378-5773
Chairman Toshiyuki Mori

Back to the top of this page

Related Forms

Construction Start Notification, Construction Completion Notification, Opinion Statement Issuance Request

Please apply at each union office for more information.

Back to the top of this page

To view the PDF file, you need "Adobe(R) Reader(R)". If you do not have it, please download it for free from Adobe website (new window).

Please let us know your feedback on how to make our website better.

Was the content of this page easy to understand?
Was this page easy to find?


We cannot respond to opinions or comments entered in this section. Also, please do not enter personal information.

Inquiries about this page

Inagi City Urban Environment Management Department Land Readjustment Division
2111 Higashi-Naganuma, Inagi City, Tokyo 206-8601
Phone number: 042-378-2111 Fax number: 042-378-9719
Contact Us for the Inagi City Urban Environment Management Department Land Readjustment Division