Sewerage-related Forms
Please use the PDF file format for printing.
Note: It is recommended to use plain paper for printing, and the print size is A4.
Thermal printers cannot accept thermal paper.
Reservations for construction consultation regarding public sewer facilities and drainage equipment installation
For construction consultations at the Sewerage Division counter in City Hall, advance reservations are being trialed.
Please inform us of the consultation details (including attachment of reference materials) and your preferred date and time for a face-to-face consultation using the link below. After confirmation, we will contact you with the scheduled date to visit the consultation desk. If we determine that a response can be provided without a face-to-face meeting, we will reply via email or phone. In such cases, please note that the face-to-face appointment will be canceled.
Application for Approval of Public Sewerage Facility Construction (Self-Funded Construction)
We will start accepting application forms, commencement notifications, and completion notifications related to public sewerage facility construction work (self-funded construction) via electronic application from July. Accordingly, we plan to end acceptance of applications at the counter from September onward, and we appreciate your understanding.
When submitting, please be sure to check that there are no omissions in filling out the form, no missing seals, and no missing documents.
The period from application to the issuance of the approval document usually takes about one week, but depending on the content, it may take more than one month. Please allow sufficient time for the procedure.
-
Submission of Public Sewerage Facility Construction [Approval Application Form] is here(External Link)
-
Submission of Public Sewerage Facility Construction Work [Start Notification] is here(External Link)
-
Submission of Public Sewerage Facility Construction Work [Completion Report] is here(External Link)
-
(Diagram) Flow of Application for Approval of Public Sewerage Facility Construction (Self-Funded Construction) (PDF 66.8KB)
-
(Example) Application Form for Approval of Public Sewerage Facility Construction (Self-Funded Construction) (PDF 259.9KB)
- Application Form for Approval of Public Sewerage Facility Construction (Self-Funded Construction) (PDF 173.2KB)
- Application Form for Approval of Public Sewerage Facility Construction (Self-Funded Construction) (Word 33.8KB)
-
(Example) Notification of Start and Completion of Public Sewerage Facility Construction (Self-Funded Construction) (PDF 395.9KB)
- Notification of Commencement and Completion of Public Sewerage Facility Construction (Self-Funded Construction) (PDF 351.1KB)
- Notification of Commencement and Completion of Public Sewerage Facility Construction (Self-Funded Construction) (Word 43.1KB)
Mast / Installation Pipe Correction Template
Note: Please submit the following correction template for the manhole/connection pipe along with the above self-funded construction completion notification.
-
Mast / Installation Pipe Correction Template (PDF 71.0KB)
-
Mast / Installation Pipe Correction Template (Excel 14.9KB)
Application for Public Restroom Installation (Public Works)
If you are unsure about whether the public manhole extraction within your property is at your own expense or public expense, please prepare the relevant guide map, public ledger, and registered copy of the property, and consult with the Sewerage Division at the counter.
Please allow approximately 5 business days for us to provide information on self-funded and publicly funded options, so we recommend coming with some time to spare.
- Public Water Meter Installation Application Form (PDF 177.2KB)
- Public Water Supply Installation Application Form (Word 113.0KB)
Sewerage work related to road occupation
If the work involves the occupation of a public road, please be sure to check "Regarding the Occupation of Public Roads" and submit the "Road Occupation Procedure Power of Attorney."
-
Regarding Road Occupation Construction (PDF 124.6KB)
- Road Occupation Procedure Delegation Document (Word 33.5KB)
Note: The "Public Water Installation Application Form" must be submitted printed on both sides.
Application for Designated Sewerage Construction Shops
-
Guidelines for Applications to Designated Sewerage Construction Shops (PDF 165.8KB)
- Application Form for Designation of Sewerage Construction Shops (PDF 301.4KB)
- Application Form for Designation of Sewerage Construction Shops (Word 35.6KB)
- For new and renewal applications, as well as notifications of changes, we will review the submitted documents in advance to shorten the processing time at the counter.
- For the procedure flow and necessary submission documents, please refer to the "Guidelines for Various Applications and Notifications for Designated Sewerage Construction Shops in Inagi City."
Please download the application form, fill it out, and submit it as a PDF or JPEG (photographed data of the attached documents, etc.) using the form below.
-
New and Change Application Application Form Pre-application is here(External Link)
-
Notification of Transfer/Change Application Form can be submitted here(External Link)
Application for Permission to Occupy Public Sewerage Facilities
- Application Form for Public Sewer Occupancy Permission (PDF 162.7KB)
- Application Form for Public Sewer Occupancy Permission (Word 68.0KB)
Water Quality
- Water Quality (PDF 288.7KB)
- Water Quality (Word 208.0KB)
-
Installation Guidelines for the "Disposer Drainage Treatment System, etc." (PDF 150.8KB)
- Disposal Drainage Treatment System Notification (PDF 212.6KB)
Please be sure to check the "Installation Guidelines for Disposal Drainage Systems, etc." regarding the installation of disposers.
In Inagi City, only products certified based on the "Performance Standards for Disposal Drainage Systems for Sewers (Draft) (March 2013)" created by the Japan Sewerage Association can be newly installed.
Drainage Equipment Related
We will start accepting electronic applications for the Plan Confirmation Application Form and Completion Notification for drainage facility construction from July. Accordingly, we plan to end acceptance of applications at the counter from September onwards, and we ask for your understanding. For the "Public Sewerage Usage Start Notification Form," please submit it using the electronic application form at the bottom of this page.
When submitting, please be sure to check that there are no omissions in the form.
-
Submit the Application Form for Drainage Facility Construction Plan Confirmation here(External Link)
-
Submit the Notification of Completion of Drainage Equipment Construction from here(External Link)
-
Drainage Facility Plan Confirmation Application Form (PDF 213.2KB)
-
Drainage Facility Plan Confirmation Application Form (Word 89.5KB)
- Completion Notification of Drainage Equipment Construction (PDF 133.8KB)
- Completion Notification of Drainage Equipment Construction (Word 57.0KB)
For viewing completed drainage facility drawings, please use the following Application Form and power of attorney.
- Application Form for Viewing Drainage Facility Completion Drawings (PDF 107.7KB)
- Power of Attorney for Viewing Drainage Facility Completion Drawings (PDF 81.4KB)
- Notification of Start of Use of Public Sewerage (PDF 207.1KB)
- Notification of Start of Use of Public Sewerage (Word 105.5KB)
If you print the Public Sewer Use Start Notification Form on both sides, a table for multiple households and apartment water numbers will be printed on the back of the Public Sewer Use Start Notification Form. If there are two or more water meters (such as in apartment buildings or two-family houses), please fill out the table for multiple households and apartment water numbers for all meters located at the installation site.
You can apply using the form below.
Sewerage Fees Related
You can apply using the form below.
To view the PDF file, you need "Adobe(R) Reader(R)". If you do not have it, please download it for free from Adobe website (new window).
Please let us know your feedback on how to make our website better.
Inquiries about this page
Inagi City Urban Environment Management Department Sewerage Division
2111 Higashi-Naganuma, Inagi City, Tokyo 206-8601
Phone number: 042-378-2111 Fax number: 042-378-9719
Contact Us for the Sewerage Division, Urban Environment Management Department, Inagi City